AfDB Rwanda Super-ESCO — Scoring Uplift Dashboard

Tender code AfDB-RWA-ESCO · Squad afdb-rwa-esco-uplift · Generated 2026-05-14 · Strict-TEC read

Headline scoring

Current (strict)
76.9
/ 100 — below gate
7-day ceiling
88.5
/ 100 — comfortable cushion
Gate to clear
80
cushion target 84
P(≥ 80) after Top-10
~92%
P(≥ 84): ~70%
CriterionFreshCeilingΔ availableSource
C1 — Firm experience (/20)16.018.5+2.5C1 agent
C2 — Methodology (/20)13.417.5+4.1C2 agent
C3 — Key experts (/50) re-read vs signed CVs43.244–45+1.5C3 agent
C4 — Alignment (/10)4.38.5+4.2C4 agent
TOTAL76.988.5+11.6
Visuals / forms / hygiene (cross-criterion)+3.5–4.0embeddedvisuals agent

🚨 Show-stoppers

S0 — KE3 Master's certificate MISSING KNOCKOUT

KE3_Certificates_/ holds KE5 Rwubahuka files; KE3 (Ouattara/Mahiri) Master + MCIPS scans not on disk. Per Clar.1 §7 = voids bid. Locate or re-request today.

S1 — KE1 BOYÉ Diplôme d'Ingénieur equivalence annotation

Polytechnique + ENPC = Bologna 2nd-cycle Master-equivalent, but strict AfDB evaluators may not auto-recognize. One-line ENIC-NARIC note required on CV.

S1b — KE2 + KE5 ECTS annotations

Otieno MSc (Hochschule Bremerhaven, 1.5 yr) and Rwubahuka MBA (Amity, 1 yr) need duration/ECTS lines on CVs.

✅ Old EoI S1 (KE4 LLM) — RESOLVED

KE4 is now Ivie EHANMO (LLM + PhD verified). Supersedes the Oseko knockout from EoI Pathway-to-80pct.

S2 — Form pack 9 of 12 missing

1B, 1C, 1F, 1G, 1H, 2A, 2B, 2C, 2D not visible. 05__Submission/ nearly empty. Form-build sprint required.

S3 — Rwanda PE/tax mitigation

Downgraded (Dietram = NKE1 not KE), but short mitigation paragraph + Form 2A line still needed.

S4 — NKE1 OPPELT CV unsigned

Only outstanding signature in the CV pack (7/8 signed).

S5 — Deadline mismatch

EoI Pathway cited 2026-04-30 17h00 Abidjan; today is 2026-05-14. Confirm: re-submission, extension, or different gate?

Top-10 ranked interventions

#InterventionCritPtsEffort (pd)Status
1Build & migrate AfDB form pack (1B, 1C, 1F, 1G, 1H, 2A–2D)Compliancegate3.0not started
2Deliverable Traceability Matrix (ToR → WP → deliverable → KE → month)C2+1.51.0drafted
3Name methodology frameworks (ASHRAE 211/Level III, IPMVP A–D, ISO 50001, EVO, RETScreen, EDGE, BASE Canvas, FIDIC)C2+2.01.0drafted
4CPM diagram (critical path, slack, gates) + captionC2+1.00.5needs PaperBanana
5Formal Risk Register (Prob × Impact × Trigger × Mitigation × Owner) — replaces Table 18C2+1.50.5drafted
6AfDB strategic-frameworks paragraph (High-5s + 10-Yr Strategy + SEFA + ASAP)C4+1.50.5drafted
7AGI / gender-lens sub-module (Bank Gender Strategy 2021–25)C4+1.00.5drafted
8GFA AfDB portfolio + BASE letter + 2 hero refsC1+2.02.0blocked Q
9Quantified capacity-building plan (50 EDCL × 6 modules × 120 h, 20 EVO auditors, …)C2+1.00.5drafted
10KE1 chronology fix + KE3 Rwanda procurement line + KE5 18-yr BD tableC3+1.51.0drafted
Modelled cumulative uplift+12.010.0→ 86–87/100

Compliance scoreboard

ItemStatus
Two-envelope structureunclear
Form 1A coverdrafted
Form 1B refsmissing
Form 1C ToR commentsmissing
Form 1D firm descriptionin DOCX
Form 1E CVs (AfDB template)7/8 signed; template conformity unverified
Forms 1F / 1G / 1Hmissing
Forms 2A–2D financialmissing
JV LoI HEAT + AESGpresent
KE1 BOYÉ Master'sannotate
KE2 OTIENO MScpass
KE3 OUATTARA Master'sMISSING
KE4 EHANMO LLM + PhDpass
KE5 RWUBAHUKA MBApass
NKE1 OPPELT signatureoutstanding
Rwanda local legal advisorTBD
Rwanda PE/tax mitigationabsent
Submission deadlineto confirm

Expert roster (signed CVs)

RoleNameMaster'sStatus
KE1 — TLBOYÉ HenriPolytechnique + ENPC Ingénieurannotate
KE2 — M&VOTIENO StephenMSc Hochschule Bremerhavensigned
KE3 — ProcurementOUATTARA Aimé (Mahiri?)INP-HB MSc + MEngCERT MISSING
KE4 — Legal/EnPCEHANMO IvieDundee LLM + PhDsigned
KE5 — BizDevRWUBAHUKA Jean ClaudeAlcalá MSc + Amity MBAsigned
NKE1OPPELT Dietramto sign
NKE2RWAMURANGWA Evodesigned
NKE3NIYONSABA Jean d'Amoursigned

7-day sequenced workplan (T = submission)

DayFocusKey deliverables
T-7 (today)Show-stopper triageS0 KE3 certs located; S5 deadline confirmed; S4 OPPELT signed; copy-paste blocks pulled
T-6Form pack A1B refs, 1C ToR comments, 1F staffing, 1G workplan
T-5Form pack B + C4 inserts1H, 2A–2D, C4 strategic-frameworks + AGI sub-module merged
T-4C2 backboneTraceability Matrix, named frameworks, quantified capacity, Risk Register
T-3C3 fixes + S3KE1 chronology, KE3 RPPA, KE5 BD table, ECTS annotations, PE/tax paragraph
T-2VisualsCPM, methodology architecture, Rwanda audit-site map, org chart, 40-MM bar, risk heat-map, ToC, captions, footers
T-1Red-team + assemblyInternal scoring ≥ 82; everything staged into 05__Submission/
TSubmitUpload before deadline (Abidjan)

Open questions for Dietram

  1. S5 — Deadline (re-submission / extended / different gate?)
  2. S0 — KE3 OUATTARA certs: misfiled or genuinely missing?
  3. Roster naming — OUATTARA Aimé vs "Mahiri" — same person?
  4. Effort envelope final: 40 MM / 102.5 PM / 880 d?
  5. GFA AfDB portfolio — pursue 2 hero refs or drop intervention?
  6. BASE letter (Super-ESCO precedent for Ehanmo) — requested?
  7. PaperBanana availability for CPM + methodology architecture renders?
  8. Rwanda local legal advisor — named bar member?
  9. AESG AfDB ref specifics — confirmed?
  10. CV format — AfDB Form 1E template vs EU?
  11. Form 1A signature in current draft?
  12. JV LoI both-side signatures present?